Company News

The first set of 85.6 blades from Zhongcai Leaf Funing Company has been successfully shipped

Date : 03-23-2020

On March 18th, the first set of Sinoma 85.6 blades independently developed by Sinoma Leaf was loaded onto trucks at the Xingou factory of Funing Company and successfully sent to Xinghua Bay, Fujian for hanging.

Sinoma85.6 is an offshore wind turbine blade developed for the 8.0MW main engine platform. It adopts a new aerodynamic shape and all glass fiber structure design independently developed by Sinoma Blade, and is currently the largest mass-produced offshore wind turbine blade product in the company. The successful mass production of this product has enabled Sinoma Blade to occupy a strong competitive position in the market above 8.0MW.

At the shipping ceremony, Comrade Wang Peng, Secretary of the Party branch and General Manager, stated that the more difficult the times are, the more we must work together and move forward courageously. The successful shipment of this blade cannot be separated from the trust of customers, the support of the government, and the joint efforts of all employees. It is the result of Funing Company's full efforts to win the battle against epidemic prevention and control and the battle for resumption of work and production. Funing Company will always maintain the spirit of "seizing every day and not wasting the youth", respond scientifically and implement precise policies, and achieve both epidemic prevention and control and production and operation goals.

1.png

2.png


Copyright ©Sinoma Wind Power Blade Co.,Ltd. 京ICP备09035434号-1
TOP